| Routine functional test | Monthly | At least 30 seconds | Activate each emergency lighting unit or system and confirm that the emergency source operates when normal power is interrupted. | Test date, location, equipment identification, person conducting the test, observed defects, and corrective-action reference. | Unit operates normally |
| Full-duration battery test | Annually | At least 90 minutes | Simulate loss of the normal power supply and verify that the emergency lighting system remains operational for the required duration. | Start and finish times, battery or system condition, failed units, measured lighting results where applicable, and follow-up actions. | 90-minute operation achieved |
| Visual condition inspection | Before each scheduled test | Complete visual review | Check for blocked or damaged luminaires, missing diffusers, visible battery leakage, damaged wiring, obstructed exit routes, and unclear directional signs. | Inspection checklist, photographs when needed, defect classification, and assigned owner. | No safety-critical defect |
| Exit-route visibility | During monthly and annual tests | Throughout the test period | Confirm that emergency luminaires and illuminated exit signs support the identification of designated escape routes during normal-power failure conditions. | Route tested, areas covered, obstructed signs or luminaires, and remedial work order number. | Route remains identifiable |
| Illumination performance | As required by the adopted code and authority | Measured at floor level where applicable | Verify that emergency lighting provides the illumination levels required by the applicable edition of NFPA 101 and locally adopted regulations. | Light-meter readings, measurement locations, instrument identification, calibration status, and test conditions. | Applicable minimum levels met |
| Defect correction | Promptly after failure | Based on risk and site procedure | Remove failed equipment from service where necessary, provide interim controls, repair or replace defective components, and retest the affected area. | Failure report, risk assessment, temporary control, repair completion date, and retest result. | Failure closed and retested |
| Test documentation retention | According to the adopted code and policy | Maintain a traceable history | Keep records that demonstrate completion of monthly and annual tests and show how deficiencies were identified, assigned, corrected, and verified. | Digital or physical log, responsible person, asset register, work orders, and completion approvals. | Records are complete and retrievable |
| Business continuity review | At least annually and after major changes | Review site-wide coverage | Reassess emergency lighting after renovations, changes in occupancy, altered escape routes, power-system modifications, or emergency-response changes. | Updated floor plans, asset inventory, risk review, revised test routes, and approval record. | Coverage matches current layout |